Be Grand Reforma, Pisos 10 a 19, CDMX, documented GNOVIA glass restoration project
Corporate case library · Record 86

Be Grand Reforma, Pisos 10 a 19, CDMX

Scratched glass · Ciudad de México · Nov 2022 – Feb 2023

Documented evidence

Compare the conditions behind this documented project

Repair of 980 m² of tempered glass affected by scratches. Documented record in Ciudad de México, Nov 2022 – Feb 2023.

980 m²Documented intervention area
Scratched glassRecorded glass condition
Residential / Real estate developmentSector
Ciudad de MéxicoLocation
Nov 2022 – Feb 2023Recorded period
TemperedDocumented glass type
CompletedStatus

Documented scope: Repair of 980 m² of tempered glass affected by scratches.

Project for: The Beck Group / Grupo Sordo Noriega (Visorno) / Be Grand

Intervention type: Repair

Company, brand and project names are documentary references taken from the corporate record and do not by themselves imply a direct contractual relationship.

Visual record of Be Grand Reforma, Pisos 10 a 19, CDMX
Why this reference matters

Before replacing glass, look for experience with the same type of problem

A comparable record helps teams verify similar damage, sectors, locations or scales before requesting an evaluation.

Decision before replacement

Compare restoration before placing a replacement order

Replacement may involve fabrication, logistics, removal, handling and reinstallation. GNOVIA first determines whether restoration is technically viable.

Discuss my project
A scratch does not always justify replacing the entire pane.

Quote by m², with a 1 m² minimum per treated pane. Assess depth, position and edge proximity. The reference pace for scratches is around 3 labor hours/m², not a guaranteed completion date. Before committing to replacement, compare a real restoration quote with the full replacement scope; possible savings are not guaranteed.