SLS Marina Beach Torre 2, Puerto Cancún, documented GNOVIA glass restoration project
Corporate case library · Record 49

SLS Marina Beach Torre 2, Puerto Cancún

Scratched glass · Cancún, México · Apr 2024 – May 2024

Documented evidence

Compare the conditions behind this documented project

Restoration of 100 m² of tempered glass affected by scratches, performed with rope access. Documented record in Cancún, México, Apr 2024 – May 2024.

100 m²Documented intervention area
Scratched glassRecorded glass condition
Residential / Real estate developmentSector
Cancún, MéxicoLocation
Apr 2024 – May 2024Recorded period
TemperedDocumented glass type
CompletedStatus

Documented scope: Restoration of 100 m² of tempered glass affected by scratches, performed with rope access.

Project for: The Beck Group

Intervention type: Restoration

Special work method: Rope-access work at height

Company, brand and project names are documentary references taken from the corporate record and do not by themselves imply a direct contractual relationship.

Visual record of SLS Marina Beach Torre 2, Puerto Cancún
Why this reference matters

Before replacing glass, look for experience with the same type of problem

A comparable record helps teams verify similar damage, sectors, locations or scales before requesting an evaluation.

Decision before replacement

Compare restoration before placing a replacement order

Replacement may involve fabrication, logistics, removal, handling and reinstallation. GNOVIA first determines whether restoration is technically viable.

Discuss my project
A scratch does not always justify replacing the entire pane.

Quote by m², with a 1 m² minimum per treated pane. Assess depth, position and edge proximity. The reference pace for scratches is around 3 labor hours/m², not a guaranteed completion date. Before committing to replacement, compare a real restoration quote with the full replacement scope; possible savings are not guaranteed.